THE ECONOMETRICS OF MACROECONOMIC MODELLING

Interest rates for government bonds RBOt and bank loans RLt

Finally, the model consists of two interest rate equations. Before the deregula­tion, so st = 0, changes in the bond rate RBOt are an autoregressive process, corrected for politically induced changes modelled by a composite dummy.

ARBOt = 0.12ARBOt_ i + 0.30sARSt + 0.95 sARWt (0.04) (0.03) (0.07)

— 0.02s • ecmRBo t-1 + 0.011RBOdumt (9.12)

(0.01) (0.001)

T = 1972(4)-2001(1) = 114

<r = 0.18%

Far(i-S)(5, 104) = 0.83[0.53]

Xnormality (2) = 0.46[0.80]

Fhetx2 (10,98) = 1. 61[0.11]

(Reference: see Table 9.2. The numbers in [..] are p-values.) where

RBOdumt = [*74q2 + 0.9*77q4 — 0.6*78q1 + 0.6*79q4 + *80q1 + *81q1 + *82q1 + 0.5*86q1 — 1.2*89q1]t.

After the deregulation, the bond rate reacts to the changes in the money - market rate sARSt as well as the foreign rate sARWt, with the long-run effects represented by the equilibrium-correcting term:

ecm. RBo, t-i = (RBO — 0.6RS — 0.75RW)t_i.

The equation for changes in the bank loan rate ARLt is determined in the short run by changes in the bond rate, with additional effects from changes in the money-market rate sARSt after the deregulation.

ARLt = — 0.0007 + 0.09 ARLt_ 1 + 0.37 sARSt + 0.11 ARBOt_ 1 (0.0002) (0.03) (0.03) (0.035)

— 0.29 s • ecmRL t_i + 0.001 s66t + 0.012 RLdumt (9.13)

(0.03) (0.0003) (0.001)

T = 1972(4)-2001(1) = 114

<7 = 0.15%

Far(i-5)(5, 102) = 1.01[0.42]

X2normality(2) = 1.04[0.59]

FHETx2(11, 95) = 0.89[0.55].

(Reference: see Table 9.2. The numbers in [..] are p-values.)

Again a rather elaborated composite dummy is needed in order to obtain white noise residuals

RLdumt = [i78q1 + 0.5i80q3 + 0.75i81q2 + 0.5i86q1 — 86q2

+ 0.75i86q4 — 0.5i89q1 — 89q3 — 0.67i92q4 + 2i98q3]t.

In the long run, the pass-through of effects from both the money-market rate and the bond rate are considerably higher:

ecm-RL, t-i = (RL — 0.8RS — 0.5RBO)t_1.

Добавить комментарий

THE ECONOMETRICS OF MACROECONOMIC MODELLING

Inflation equations derived from the P*-model

The P*-model is presented in Section 8.5.4. The basic variables of the model are calculated in much the same way for Norway as for the Euro area in the previous …

Forecast comparisons

Both models condition upon the rate of unemployment ut, average labour productivity at, import prices pit, and GDP mainland output yt. In order to investigate the dynamic forecasting properties we …

The NPCM in Norway

Consider the NPCM (with forward term only) estimated on quarterly Norwegian data[65]: Apt = 1.06 Apt+1 + 0.01 wst + 0.04 Apit + dummies (7.21) (0.11) (0.02) (0.02) x2(10) = …

Как с нами связаться:

Украина:
г.Александрия
тел./факс +38 05235  77193 Бухгалтерия

+38 050 457 13 30 — Рашид - продажи новинок
e-mail: msd@msd.com.ua
Схема проезда к производственному офису:
Схема проезда к МСД

Партнеры МСД

Контакты для заказов оборудования:

Внимание! На этом сайте большинство материалов - техническая литература в помощь предпринимателю. Так же большинство производственного оборудования сегодня не актуально. Уточнить можно по почте: Эл. почта: msd@msd.com.ua

+38 050 512 1194 Александр
- телефон для консультаций и заказов спец.оборудования, дробилок, уловителей, дражираторов, гереторных насосов и инженерных решений.