Eco-Urban Design

To achieve Leed Gold certification, the

To achieve Leed Gold certification, theproject’s Construction Management policy and use of materials was closely scrutinised and implemented.

Construction waste was reduced through recycling. Fly-ash was used in the concrete sections of the building. Additionally, glass tiles, steelwork and carpets all included recycled material.

Renewable materials included cork floors, bamboo wall panels and doors made with rice hull cores. All wood-based materials were certified in accordance with the Forest Stewardship Council’s principles and criteria. A regional sourcing policy on materials was also adopted in an attempt to reduce transportation as far as possible.

The development of the EPA’s eco-roof (Fig. 11) was implemented by the designers, Zimmer Gunsal Frasca, in consultation with the EPA’s own experts in this field.

In the Front Range climate zone precipitation is scarce. The team’s goals were to demonstrate to local authorities that Denver’s first eco-roof could remove pollutants from storm water and reduce the run-off rate of this precious resource.

It is thought that green roofs, where appropriate, adopted as a city policy can greatly reduce the ‘heat island effect’ produced by conventional, dark, untextured roofing in dense urban areas. The EPA roof was installed over three terraced levels totalling 20,000 square feet. The vegetation is made up of native plant species and soil media. The performance of the roof’s components is being monitored by various groups including the EPA, the city, the Department of Horticulture at Colorado State University and the Denver Botanical Garden. This study hopes to inspire the future development of these technologies in the Denver region.

In a further effort to achieve a 44% water saving compared to standard buildings, high efficiency and waterless plumbing fixtures are employed throughout the building.

In order to fulfil the EPA’s mission statement “To protect the public’s health and safeguard the natural environment”, post completion evaluations are conducted by the EPA and architects, Zimmer Gunsel Frasca demonstrating that the project’s aims have been achieved, including the predicted significant energy and water usage savings.

To achieve Leed Gold certification, the

Eco-Urban Design

Gleneagles Community Centre

West Vancouver, Canada2003 Patkau Architects Inc.www. patkau. ca West Vancouver is located on the north shore of the Burrard Inlet in British Columbia. The waterfront district is defined by its …

Center

Philadelphia, USA2003 Croxton Collaborative Architects P C.www. croxtoncollaborative. com The Philadelphia Police Department Forensic Science Center is located in a formerly derelict and abandoned school building (Fig. 1). The art …

Green Dot E. 27th Street. Charter High Schools

Los Angeles, USA2008 John Friedman Alice Kimm Architectswww. jfak. net The challenge of providing inner city youth with a college preparatory education has long been a major concern for parents …

Как с нами связаться:

Украина:
г.Александрия
тел./факс +38 05235  77193 Бухгалтерия

+38 050 457 13 30 — Рашид - продажи новинок
e-mail: msd@msd.com.ua
Схема проезда к производственному офису:
Схема проезда к МСД

Партнеры МСД

Контакты для заказов оборудования:

Внимание! На этом сайте большинство материалов - техническая литература в помощь предпринимателю. Так же большинство производственного оборудования сегодня не актуально. Уточнить можно по почте: Эл. почта: msd@msd.com.ua

+38 050 512 1194 Александр
- телефон для консультаций и заказов спец.оборудования, дробилок, уловителей, дражираторов, гереторных насосов и инженерных решений.