Design for Outdoor Recreation

The wind-down

After having driven, often for long distances and perhaps in heavy traffic and stressful conditions, it takes a little time to adjust to the ambience of the outdoors. The adjustment can be aided by a stretch of road between the entrance and the first stopping point, such as a car park or scenic turnout, which helps the car occupants to relax a little, absorb the scenery and become used to the possible presence of wildlife near or on the road, walkers crossing or small children playing. The length need not be very long if space does not allow it, but even a short wind down can be very useful.

As well as benefiting the car occupants, the wind-down also helps to ensure that there is adequate physical separation between the main car parking area and the public highway. In Europe, where traffic is heavy, getting away from noise, pollution and physical danger to children and pets is an important issue. Noise may be difficult to avoid unless landform can be used to absorb it, but physical separation should be as great as is feasible. Even in remoter, quieter landscapes the drive down a winding lane from the highway can increase anticipation and the sense of mystery, as well as helping to slow vehicles down.

The wind-down

The wind-down

Two layouts for entrances with pay-stations. These show arrangements for the British, Australian or New Zealand driving side: reverse them for North America, Continental Europe etc. (a) In this example a loop allows people to leave before they pass the pay-station in case they decide that fees are unacceptable. The entrance can be closed while one-way flow control allows for people to leave after the entrance has closed. (b) Some parking for limited use is worth providing for local, frequent users or during the low season, when the main site is closed: shown here as a short loop off the entrance area.

The slower travelling speed can be achieved with a narrower road width, rougher surface and tighter curves, as well as speed limit signs. Glimpses of scenery along the road (see ‘Roadside landscape design’ above) can also be used to increase anticipation and reduce speed.

Design for Outdoor Recreation

Log barriers

Simple, stout barriers constructed from thick, straight logs placed on two short, upright posts of similar dimensions and set fairly deeply into the ground are quite effective. Varying the length …

Earth mounds

These can be constructed from spare excavated material. They need to be steeply graded on the side facing the parking spaces, and should be graded into the landform on the …

Construction

The car park construction will normally include a certain amount of excavation, which should be done in stages. For example, turf should be stripped and stored, followed by topsoil removal …

Как с нами связаться:

Украина:
г.Александрия
тел./факс +38 05235  77193 Бухгалтерия

+38 050 457 13 30 — Рашид - продажи новинок
e-mail: msd@msd.com.ua
Схема проезда к производственному офису:
Схема проезда к МСД

Партнеры МСД

Контакты для заказов оборудования:

Внимание! На этом сайте большинство материалов - техническая литература в помощь предпринимателю. Так же большинство производственного оборудования сегодня не актуально. Уточнить можно по почте: Эл. почта: msd@msd.com.ua

+38 050 512 1194 Александр
- телефон для консультаций и заказов спец.оборудования, дробилок, уловителей, дражираторов, гереторных насосов и инженерных решений.