In remote, lightly used locations the lower wear and tear expected will favour unsealed surfaces; the converse will apply at popular, heavily used areas. This also applies at short - stay facilities, where the turnover of visitors means that the surfaces are likely to be heavily used by vehicles.

Location

If the ROS is being followed then the remoter, wilder areas will favour unsealed surfaces, whereas in the more urban settings sealed finishes will be more acceptable. It may also be appropriate to use unsealed surfaces near urban areas to emphasize the more relaxed, rural or wild setting and atmosphere being created.

Drainage

Surfacing must include proper attention to drainage. Sealed surfaces produce more run­off, which has to be channelled away. Expensive pipe drains can be entertained only on large developments. Laying the surface to gradients allowing run-off into french drains (rubble-filled ditches), into open ditches or over the surface of nearby areas may be acceptable instead. Care must be taken to avoid drainage water flowing directly into streams, as the silt and pollutants (oil, fuel, and exhaust particles) could be harmful to aquatic life.

Expected degree of use

Diagram showing how snow storage can be designed into the car park layout together with the meltwater drainage.

Unsealed surfaces also need to be kept drained, although water may percolate through them to a greater degree. Good gradients across the area are needed, but areas to be drained should be broken into sections to avoid the danger of erosion, particularly during heavy rainstorms. Unsealed surfaces can be prone to washout. Excess water in the structure of the road weakens it and can make it more prone to structural failure under heavy loads such as fully laden coaches.

Design for Outdoor Recreation

Log barriers

Simple, stout barriers constructed from thick, straight logs placed on two short, upright posts of similar dimensions and set fairly deeply into the ground are quite effective. Varying the length …

Earth mounds

These can be constructed from spare excavated material. They need to be steeply graded on the side facing the parking spaces, and should be graded into the landform on the …

Construction

The car park construction will normally include a certain amount of excavation, which should be done in stages. For example, turf should be stripped and stored, followed by topsoil removal …

Как с нами связаться:

Украина:
г.Александрия
тел./факс +38 05235  77193 Бухгалтерия

+38 050 457 13 30 — Рашид - продажи новинок
e-mail: msd@msd.com.ua
Схема проезда к производственному офису:
Схема проезда к МСД

Партнеры МСД

Контакты для заказов оборудования:

Внимание! На этом сайте большинство материалов - техническая литература в помощь предпринимателю. Так же большинство производственного оборудования сегодня не актуально. Уточнить можно по почте: Эл. почта: msd@msd.com.ua

+38 050 512 1194 Александр
- телефон для консультаций и заказов спец.оборудования, дробилок, уловителей, дражираторов, гереторных насосов и инженерных решений.