Whether you are working with new construction or a remodeling project, special structural con­siderations may be necessary for many different installations. Again, your building contractor may be well aware of these issues, but careful planning or a careful examination of the current struc­tural components in the bathroom will be critical when making decisions about design options. You can begin with the original construction plans as a guide, but eventually you will need to verify that the structure is actually built as indicated on the plans. Chapter 5 has useful information, forms, and checklists to help you gather information about the existing structure. Form 6: Jobsite Inspection will be especially useful to inspect the structure.

Following are some of the structural considerations to keep in mind.

Floor Structures

Whenever the floor will be changed in some manner during your remodeling project, it is impor­tant to know more about the floor structure and what is hidden within that floor. Once you have verified the direction and size of the floor joists or floor trusses, it is essential that you know what components are already within the floor structure so that you do not damage them during the remodeling process. Concealed air ducts or plumbing may be difficult and expensive to relocate. After this inspection you will have a better idea of how to proceed with plans for new plumbing, wiring, or heating components that need to be placed in the floor. An examination of structural components will also help you determine the floor strength.

When locating a toilet in a new bathroom, floor framing must take into account the toilet place­ment so that the waste pipe can be properly installed between the joists in the floor (see Figure 2.1). If you are remodeling and plan to move the toilet location, the waste pipe may need to be relo­cated, depending on the distance it is moved. This may be a very difficult and expensive process. When only a small adjustment needs to be made in order for the toilet to line up with the waste drain, an offset flange attachment can allow you to move the toilet as much as 2 inches (51 mm), code permitting of course, in order to make use of the current waste drain. Roof venting may also need to be adjusted, so check to see what that may involve.

Damage

Check for any water damage that may have weakened the floor structure. Leaking toilets or pipes can cause structural supports to deteriorate over time, and often this damage goes undetected

Подпись: FIGURE 2.1 Check for ductwork, pipes, or electrical wiring hidden between the joists before drilling through floors or ceilings. NKBA
STRUCTURAL ISSUES

because it is hidden by a floor covering. Lifting or removing the floor covering or checking for possible evidence of water damage on the ceiling directly below the bathroom will give clues to such damage.

If the damage is severe, subflooring materials or even floor joists may need to be replaced or rein­forced. To prevent some of these problems in the future, seal the floors to prevent moisture from reaching the subflooring and joists. This is especially true around toilets, tubs, or showers.

The floor covering may serve as the seal if it is made of a material that water cannot penetrate and is caulked at the joints and seams. Special concrete or other poured floors may be a better choice for sealing out water as well as providing additional floor stability. Along with the structural dam­age, you may find mold inside the floor area where moisture was trapped. Chapter 3, "Environ­mental and Sustainability Considerations," discusses mold in greater detail.

Another type of damage prominent in warmer climates is termite damage. If the home has not been inspected for termites, then this would be important to recommend to your client. If the home has a history of termite infestation or if close neighbors have termites, an inspection should be completed before you begin the remodeling project. Termites can cause a tremendous amount of damage to the structure, so eliminating the threat and correcting the damage will provide a high-quality structure for your new project.

BOSTON FURNITURE

Dimensions (Forms 7 through 10)

Accurate dimensions of the existing space are critical for a renovation project. This is also true for any fixtures or structural elements that will remain in the newly designed space …

THE JOBSITE

Before you can begin the actual design, you have one more major assessment. This is of the jobsite. Structurally and mechanically, you need to know if you can make your …

Client’s Preferences and specifications

Many clients think and dream about a bathroom project before it becomes a reality. They read shelter magazines, visit showrooms, and surf the Internet. Many have a file of ideas …

Как с нами связаться:

Украина:
г.Александрия
тел./факс +38 05235  77193 Бухгалтерия

+38 050 457 13 30 — Рашид - продажи новинок
e-mail: msd@msd.com.ua
Схема проезда к производственному офису:
Схема проезда к МСД

Партнеры МСД

Контакты для заказов оборудования:

Внимание! На этом сайте большинство материалов - техническая литература в помощь предпринимателю. Так же большинство производственного оборудования сегодня не актуально. Уточнить можно по почте: Эл. почта: msd@msd.com.ua

+38 050 512 1194 Александр
- телефон для консультаций и заказов спец.оборудования, дробилок, уловителей, дражираторов, гереторных насосов и инженерных решений.