ANUAL SERVICE M

ENGINE INSTALLATION

Apply molybdenum disulfide paste to the engine contact area of the front engine hanger.

Carefully align the Install the engine in the frame.

mounting points to Apply thin coat of grease to the swingarm pivot bolt prevent damage to sliding surface.

engine, frame, wire Loosely install the swingarm pivot bolt, washer and and cables, nut.

Loosely install the engine mounting bolts, washers and nuts.

• Route the wires and cables properly ('05 - '07: page 1-25, After '07: page 1-32).

• Do not tighten the swingarm pivot nut and engine mounting nuts yet.

Install the engine hanger plates, fuel hose guide, clutch cable guide, upper engine mounting bolt, washer, nut and engine hanger plate bolts.

Tighten the engine mounting nuts, engine hanger plate bolts and swingarm pivot nut to the specified torque.

TORQUE:

Swingarm pivot nut: 88 N m (9.0 kgf-m, 65 Ibf ft) Engine hanger plate bolt:

26 N m (2.7 kgf-m, 19 lbf-ft)

Engine mounting nut:

(front): 54 N-m (5.5 kgf-m, 40 lbf-ft)

(upper): 54 N-m (5.5 kgf-m, 40 lbf-ft)

(lower): 54 N-m (5.5 kgf-m, 40 lbf-ft)

Install the water hose joint to the cylinder head.

Connect the radiator hoses and tighten the band screws securely.

BOLTS/WASHERS/ NUTS

ENGINE HANGAR PLATES BOLTS /Ж

JSmm

1

CABLE GUIDE I

BOLT/NUT

HOSE GUIDE

RADIATOR HOSES

WATER HOSE JOINT

ENGINE INSTALLATIONConnect the alternator 4P (Black) and ignition pulse generator 2P (Black) connectors.

Route the wire harness properly 105 - 07: page 1­25, After ’07: page 1-32).

WIRE BAND

Install the wire band.

CONNECTORS

STARTER MOTOR CABLE N

GROUND CABLE

CRANKCASE BREATHER HOSE

ENGINE INSTALLATION

Connect the starter motor cable and tighten the nut securely.

ENGINE INSTALLATION

TRANSMISSION BREATHER HOSE

Connect the clutch cable to the clutch lifter lever. Install the clutch cable stay and ground cable and tighten the bolts securely.

Connect the breather hoses.

Install the following:

- Ignition coil (page 18-8)

- Radiator reserve tank (page 7-9)

- Brake pedal (page 16-24)

- Gearshift pedal (page 11-27)

- Kickstarter pedal (page 11-7)

- Drive sprocket (page 8-4)

- Carburetor (page 6-24)

- Exhaust system (page 3-14)

- Spark plug cap (page 4-12)

- Fuel tank (page 3-8)

- Left/right/center engine guards (page 3-5)

- Seat (page 3-3)

‘05 and 06 California type. After 06:

Install the PAIR control valve (page 6-30).

Fill the system with the recommended coolant and bleed the air (page 7-7).

Fill the engine with the recommended engine oil (page 4-19).

Fill the transmission with the recommended trans­mission oil (page 4-23).

After installing the engine, perform the following inspections and adjustments:

- Throttle grip freeplay (page 4-9)

- Drive chain slack (page 4-24)

- Clutch lever freeplay (page 4-31)

Check the exhaust system for leaks.

ENGINE INSTALLATION

ANUAL SERVICE M

TROUBLESHOOTING

ENGINE DOES NOT START OR IS HARD TO START 1. Fuel Line Inspection Check fuel flow to carburetor. Does fuel reach the carburetor? IMO - • Clogged fuel hose or …

WIRING DIAGRAM

WIRING DIAGRAM WIRING DIAGRAM

STARTER SWITCH

INSPECTION '05 - '07: Remove the front visor. - '05 -'07: (page 3-5) - After '07: (page 3-6) Disconnect the starter switch 2P (Black) connector. STARTER SWITCH Check for continuity …

Как с нами связаться:

Украина:
г.Александрия
тел./факс +38 05235  77193 Бухгалтерия

+38 050 457 13 30 — Рашид - продажи новинок
e-mail: msd@msd.com.ua
Схема проезда к производственному офису:
Схема проезда к МСД

Партнеры МСД

Контакты для заказов оборудования:

Внимание! На этом сайте большинство материалов - техническая литература в помощь предпринимателю. Так же большинство производственного оборудования сегодня не актуально. Уточнить можно по почте: Эл. почта: msd@msd.com.ua

+38 050 512 1194 Александр
- телефон для консультаций и заказов спец.оборудования, дробилок, уловителей, дражираторов, гереторных насосов и инженерных решений.